Your customers
- Builders and developers
- Building contractors
- Block dealers
- Government and industrial projects
Construction and home · Makers and factories
Set up the way an AAC block plant runs: sale of AAC blocks per cbm (4 to 9 inch) to builders and dealers, plus jointing mortar per bag. Routines, workflows, registers, licences and an AI team that knows the work are ready when you sign up.
Ready when you sign up
What this solves
Builder credit stretches beyond 60 days and some sites stop paying. Fuel and breakage per cbm rise unseen.
MatruOS sets up 8 routines, 1 workflow, 3 registers and 10 licences for an AAC block plant, with an AI team that reads your own records and prepares the work.
The right person is reminded at the right time, approvals wait for whoever decides, and every licence has a renewal reminder. Anything that sends, pays, signs, files or deletes waits for a person's approval.
Where you sit
Who you sell to, who you buy from, how credit moves and where you sit in the chain decide how your screens, reminders and reports are set up.
Your customers
Your suppliers
Credit and cash
Builders 30-60 days, some 90; dealers 15-30 days; raw materials 15-30 days, aluminium paste often advance
High fixed cost (loan EMI, power, boiler fuel) every month; builders pay in 30-60 days and run-away dues are the main risk.
Your screens use your words
How it works
Set-up takes a few minutes. After that, you change only what is different in your business.
Your AI team
Each job goes to a member of your AI team. It reads your own records and prepares the work. Anything that sends, pays, signs, files or deletes waits for a person's approval.
Works out fuel per cbm, power per cbm and breakage % each day, and flags shifts or batches outside target or density band
Works it out and shows you
Groups tomorrow's orders by site and size, checks stock, proposes truck loads and times, and drafts site confirmation messages
Asks you before sending
Ages builder and dealer dues, proposes a hold list, and drafts reminders citing the 45-day MSME rule
Asks you before sending
How you run
Each routine has a time, a person and its steps with the checks that matter. MatruOS reminds the right person and keeps the record. Open one to see its steps.
Every day
Every week
Every month
Every year
Workflows
Work passes stage by stage to the right person. Stages marked for approval wait for the person who decides.
Registers and SOPs
Registers hold the fields this trade records. SOPs carry the steps and checks, so work is done the same way every time.
Batch and autoclave log
Dispatch and builder ledger
Lab test record
AAC block quality
Blocks that meet the declared grade and do not crack walls
Boiler and autoclave safety
No explosion and no stoppage on inspection
Items and licences
Starter items arrive with unit, HSN and GST rate. The registrations this business usually needs are listed with a reminder before each one expires.
| Item | HSN | GST |
|---|---|---|
| AAC block 100 mm (4 inch) | 6810 | 18% |
| AAC block 150 mm (6 inch) | 6810 | 18% |
| AAC block 200 mm (8 inch) | 6810 | 18% |
| AAC block 230 mm (9 inch) | 6810 | 18% |
| Block jointing mortar | 3214 | 18% |
| Broken block and dust | 6810 | 18% |
Your people
Each person sees the screens and reminders for the work they do.
Not covered yet
Type one line about your business when you sign up, for example "AAC block plant". MatruOS picks this business type and sets up everything on this page in a few minutes. You then get a 7-day free trial, no card needed.
No. The routines, workflows, registers, items, licences and AI team on this page arrive already set up. You change what is different in your business, and bring your customers, items and balances from Zoho Books, Vyapar, Excel and others, with our team's help for Tally data.
Yes. Every routine, workflow, register and SOP is yours to rename, retime, switch off or add to. MatruOS keeps the rest of the system in step with your changes.
It runs routine checks and prepares drafts. Anything that sends, pays, signs, files or deletes waits for a person's approval. The one exception you can choose is payment reminders, which go out on their own once you have checked them and switched them on.
Construction and home
Describe your business once. MatruOS sets up your apps, brings in your data and puts Muni and the AI team to work, with your approval on every step that matters. 7-day free trial, no card needed.
See plans and what each includes