Your customers
- DISCOMs and their divisions
- Large EPC firms (sub-contracts under RDSS)
- Factories and cold stores taking HT supply
- Hospitals and malls
- Solar and wind developers (evacuation lines)
- Industrial estates and builders
Fuel, energy and recycling · Services
Set up the way an HT line and substation contractor runs: measured erection rates for lines, poles, transformer centres and substations on DISCOM work orders; lump-sum supply-and-erection for consumer HT connections; testing, liaison and charging fees; substation and line maintenance contracts. Routines, workflows, registers, licences and an AI team that knows the work are ready when you sign up.
Ready when you sign up
What this solves
DISCOM bills and retention sit for months and nobody tracks which division owes what. Material issued from DISCOM stores does not reconcile at the end and is recovered from the bill.
MatruOS sets up 7 routines, 2 workflows, 4 registers and 11 licences for an HT line and substation contractor, with an AI team that reads your own records and prepares the work.
The right person is reminded at the right time, approvals wait for whoever decides, and every licence has a renewal reminder. Anything that sends, pays, signs, files or deletes waits for a person's approval.
Where you sit
Who you sell to, who you buy from, how credit moves and where you sit in the chain decide how your screens, reminders and reports are set up.
Your customers
Your suppliers
Credit and cash
DISCOM bills paid 60-180 days after the measurement book is checked, with 5-10% retention till the defect liability period ends; consumer jobs 30-40% advance, 40-50% on material at site, balance on charging; suppliers give 30-60 days to regular contractors
Material bought on supplier credit and earnest money and performance guarantees locked in banks; DISCOM payments slow, so working capital limit and BG limit decide how much work can be taken
Your screens use your words
How it works
Set-up takes a few minutes. After that, you change only what is different in your business.
Your AI team
Each job goes to a member of your AI team. It reads your own records and prepares the work. Anything that sends, pays, signs, files or deletes waits for a person's approval.
Totals each site's daily progress against the work order and checks material used against standard quantities per km and per transformer centre, flagging gaps
Works it out and shows you
Prepares an item-wise estimate and bid rate for a tender or consumer enquiry from the bill of quantities and current material rates
Asks you before sending
Prepares running bills from measured quantities, ages pending bills by division, and lists retention and bank guarantees coming due
Asks you before sending
Reminds 60 and 15 days before the contractor licence, supervisor certificates, vendor registration and insurance expire
Works it out and shows you
How you run
Each routine has a time, a person and its steps with the checks that matter. MatruOS reminds the right person and keeps the record. Open one to see its steps.
Every day
Every week
Every month
Every year
Workflows
Work passes stage by stage to the right person. Stages marked for approval wait for the person who decides.
Registers and SOPs
Registers hold the fields this trade records. SOPs carry the steps and checks, so work is done the same way every time.
Work order and measurement book
Material at site account
Shutdown and permit-to-work register
Test and charging record
Shutdown and permit to work on HT lines
Nobody touches a line that can be charged
Test before charging
Charge only installations that pass tests and clearances
Items and licences
Starter items arrive with unit, HSN and GST rate. The registrations this business usually needs are listed with a reminder before each one expires.
| Item | HSN | GST |
|---|---|---|
| 11 kV overhead line on 9.1 m PSC poles, 55 sq mm AAAC | 995432 | 18% |
| 33 kV single circuit line on PSC poles, 100 sq mm AAAC | 995432 | 18% |
| LT AB cable line, 3x16+25 sq mm | 995432 | 18% |
| 63 kVA distribution transformer centre erection (supply and erect) | 995432 | 18% |
| 100 kVA distribution transformer centre erection (supply and erect) | 995432 | 18% |
| 11 kV consumer HT connection (tap line, metering cubicle, VCB, earthing) | 995432 | 18% |
| 11 kV XLPE cable laying and termination | 995461 | 18% |
| Substation earthing pit (supply and fix) | 995461 | 18% |
| Testing, inspection liaison and charging | 998346 | 18% |
| Substation and line maintenance contract | 998714 | 18% |
Your people
Each person sees the screens and reminders for the work they do.
Not covered yet
Type one line about your business when you sign up, for example "HT line and substation contractor". MatruOS picks this business type and sets up everything on this page in a few minutes. You then get a 7-day free trial, no card needed.
No. The routines, workflows, registers, items, licences and AI team on this page arrive already set up. You change what is different in your business, and bring your customers, items and balances from Zoho Books, Vyapar, Excel and others, with our team's help for Tally data.
Yes. Every routine, workflow, register and SOP is yours to rename, retime, switch off or add to. MatruOS keeps the rest of the system in step with your changes.
It runs routine checks and prepares drafts. Anything that sends, pays, signs, files or deletes waits for a person's approval. The one exception you can choose is payment reminders, which go out on their own once you have checked them and switched them on.
Fuel, energy and recycling
Describe your business once. MatruOS sets up your apps, brings in your data and puts Muni and the AI team to work, with your approval on every step that matters. 7-day free trial, no card needed.
See plans and what each includes